DETAILED PROJECT DESCRIPTION

HIGHWAYS & ROADS

Sr.
No.
NAME OF PROJECT FINANCIAL
OUTLAY
(Rs. Million)
COMPLETION
TIME
(Months)
YEAR A B C D E F G H I
1 Top and Resident Supervision of ADP/Non ADP works of the Highway Department Sarghoda. 500.00 36 2001
2 Detailed Design of Sheikhupura – Faisalabad Dual Carriageway Project (83.5-Km) 2000.00 12 1999
3 Dargai – Saidu – Kalam Road project (170-Km) 2980.00 24 1996
4 TMP – Bahawalpur road Project (91-Km) 2000.00 182.00 1994
5 Panjgur – Gichik – Awaran Road (190-Km) 1900.00 18 1993
6 Farm to Market Roads Project. Ph-II, Distt. Multan
(108-Km)
250.00 48 1992
7 Coal Mines Circular Road Project, Quetta, (Length 62-KM) 140.00 24 1991
8 Sargodha Housing Colony, raiwind road, Lahore. 10.00 9 1991
9 Detailed design of top priority city Roads of Faisalabad i.e. Sammundari Road (12-Km) and Nanwala Road (6.5-Km) 370.00 6 1991
10 9 City Roads in Faislabad (Total Length 140-Km) 3000.00 12 1990
11 Pishin – Saranan Road Project (Length 13-Km) Balochistan 30.00 12 1990
12 VWestern Bypass Quetta Road Project (Length 23-km) Blochistan 100.00 18 1989
13 Khaki to Perhina via Bandi Miara in Mansehra District (9.29-Km) NWFP 5.60 6 1989
14 Baffa to Doraha sandasar Road in Mansehra District (7.29-Km) NWFP 3.25 6 1989
15. Mansehra to Khushala in Mansehra Distt (Length 3.5-Km) NWFP 2.37 6 1989
16. Ogra Mayan Road in Mansehra district (4.4-Km) NWFP 3.00 6 1989
17 Road from Dhodial via Jaba Sheep Farm to Bassian Mansehra Distt. (19.1-Km) NWFP 10.76 12 1989
18 Road from Rehanpur to haysari in dir District (2.5-Km) NWFP 1.68 6 1989
19 Road from Rabat to spin khawar in Dir District (3.5-Km) NWFP 2.28 6 1989
20 Road from Baroon to Khel in Dir District (5.4-Km) NWFP 7.38 6 1989
21 Road from D.G. Khan to Fateh Mandoo in D.I. Khan Distt.(4-Km) NWFP 3.62 6 1989
22 Road From to Naivela to Tubewell No.10 in D.I. Khan Distt.(4-Km) NWFP 1.62 6 1989
23 Jumma Sharif road to Area Candi Umer Khan in D.I.Khan (7-Km) NWFP 3.62 6 1989-
24 From Dargai bazar to Kharkai Malakand Agency (4-Km) NWFP 2.00 6 1989
25 Dargai to Jaban Road in Malakand Agency (6.3-Km) NWFP 3.20 6 1989
26 Inqilab Road to Shamshatoo Canal Road in Peshawar Distt (6.5-Km) NWFP 2.80 6 1989
27 Road from Mitha Khattak to Sultankhel in Mianwali Distt (8-Km) Punjab 6.00 6 1989
28 Road from mile 265 of Lahore Sargodha Minawali Bannu Art Road No.2 to Awanwala via Sarkia (15-30-Km) Punjab 8.27 9 1989
29 Kot Chandna Afghan Refugees Camp 6 to Tola Mangali in District Mianwali (4-Km) Punjab 3.62 6 1989
30 Indus Highway (N-55) Secdtion Bannu-D.I. Khan (80-Km) NWFP 320.00 24 1989
31 Indus Highway (N-55) Section Dadu-Larkana, Kakkar-Nasirabad (42-Km) Sind 166.00 18 1988
32 Indus Highway (N-55) Section Dadu-Larkana, Nasirabad – Pakko (36-Km) Sind 150.00 18 1988
33 Indus Highway (N-55) Section Dadu-Larkana. Bhan Bridge – Kakkar (48-Km) Sind 200.00 18 1987
34 Kahuti – Barhad Road, (33.5-Km) in most difficult mountainous terrain. Punajb 100.00 8 1987
35 Access Road to Dhurnai Oil Field (5-Km) in hilly terrain Punjab 5.00 6 1987
36 Rawalpindi – Murree – Kashmir Road, Mile 5.75 to 25.0. Punjab 50.00 12 1986
TOTAL 14342.07

 

SERVICES:

A      Surveys                                                                                                   F       Preliminary Design

B      Geotechnical investigations                                                                G      Final Design/Cost Estimates

C      Hydrological Investigations                                                                  H      Tender Documents

D      Traffic Studies                                                                                        I        Construction Supervision

E      Feasibility / Economic Studies

BRIDGES

Sr.
No.
NAME OF PROJECT FINANCIAL
OUTLAY
(Rs. Million)
COMPLETION
TIME
(Months)
YEAR A B C D E F G H I
1 13 Bridges at Km 46+493, 51+370, 51+540, 54+285, 66+035, 68+826, 75+691, 80+800, 86+004, 88-936, 102+833 & 122+962 Sheikhupura – Faisalabad Dual Carriageway Project Punjab 200.00 12 1999
2 19 Bridges at Km, 20+6333, 27+852, 58+969, 58+831, 72+080, 87+837, 97+961, 103+475, 108+270, 112+920, 113+125, 124+908, 127+331, 129+629, 132+924, 136+112, 140+462, 153+440, 153+753, Daragai – Saidu – Kalam Road project (NWFP) 300.00 24 1996
3 41 brides at Km. 6+900, 26+300, 40+825, 41+275, 41+625, 48+775, 58+333, 61+475, 66+785, 66+950, 70+950, 71+050, 71+520, 72+880, 73+600, 80+600, 86+900, 88+450, 98+700, 101+150, 103+210, 103+570, 110+480, 113+815, 114+757, 118+210, 118+620, 123+530, 123+730, 126+100, 128+735, 132+715, 134+050, 134+760, 137+320, 139+450, 143+537, 148+300, 149+970, 150+293, 162+525, 166+135, 168+050, 175+350, 179+460, 181+910, 185+542 & 185+927, Panjgur – Gichik – Awaran Road (Balochistan) 380.00 18 1993
4 Bridge at Km. 6+365 ADB # 30616 FMR, Phase-11, Multan (Punjab 20.000 12 1992
5 2 bridges at Km 3+380 & 3+372 ADB # 30614 FMR, Phase-11, Multan Punjab 10.00 12 1992
6 Bridge at Km, 7+250 ABD # 30610 FMR, Phase-11, Multan Punjab 5.00 6 1992
7 4 Bridges at Km. 22+305, 36+422 & 42+262 Coal mines Circular Road, Quetta – Balochistan 20.00 24 1992
8 18 Bridges at Km, 0+280, 0+350, 0+950, 1+320, 2+550, 3+500, 4+350, 5+200, 6+050, 6+600, 7+650, 7+785, 9+000, 9+725, 11+800, 13+650, 16+130, 19+100 Western Bypass, Quetta – Balochistan 10.00 18 1989
9 Bridge at Km 1+700 Pashin – Saranan Road 10.00 12 1990
10 10 Bridges at Km, 2+375, 9+065, 11+050, 17+200, 24+140, 26+711, 27+075, 45+897, 45+967 & 57+151 Bannu – D.I. Khan (N-55) NWFP 50.00 24 1989
11 3 Bridge at Km. 8+595, 23+928 & 25+707 Nasirabad Pakko (N-55) Sind 30.00 18 1998
12 Bridges at Km. 6+695, 22+106 & 36+116 Kakkar – Nasirabad (N-55) Sind 25.00 18 1998
13 4 Bridges at Km. 0+700, 14+218, 30+755 & 41+868 Bhan Bridge – Kakkar (N-55) Sind 40.00 18 1987
14 Rajoya Bridge Near Abbotabad (NWFP) 20.00 6 1986
15 Bridge at Salgran 20 miles on Rawalpindi – Murree – Kashmir Road, Punjab 15.00 6 1986
Total number of Bridges 129

 

Super Structure: RCC Girder and Prestressed Concrete Girdar

 

Spans varying from 7 meter to 40 meter

 

Substructure: Open footing & Pile Foundation

 

Total

 

 

 

 

 

 

 

1135.00

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SERVICES:

A      Surveys                                                                                                   F       Preliminary Design

B      Geotechnical investigations                                                                G      Final Design/Cost Estimates

C      Hydrological Investigations                                                                  H      Tender Documents

D      Traffic Studies                                                                                        I        Construction Supervision

E      Feasibility / Economic Studies

SURVEY & MAPPING

Sr.
No.
NAME OF PROJECT FINANCIAL
OUTLAY
(Rs. Million)
COMPLETION
TIME
(Months)
YEAR A B C D E F G H I
1 Rural Electrification Project Group “G” 475 Villages (Sind 230.00 36 1997
2 Dargai – Saidu – Kalam Road Project (170-Km) NWFP 2980.00 12 1996
3 Panjgur – Gichik – Awaran road, quetta, Balochistan (190-Km) Balochistan 1900.00 12 1993
4 Farm to Market Roads Project, Ph-II Section-I, Multan (108-Km) 250.00 12 1992
5 Coal Mins Circular Road Project, Quetta (62-Km) Balochistan 140.00 12 1991
6 Sargodha Housing Colony, Raiwind Road, Lahore (1000 Kanals) Punjab 150.00 12 1996
7 Phase-I, Top Priority City Roads of Faisalabad 370.00 6 1991
8 8 City of Faisalabad 140-Km 3000.00 12 1990
9 Baja Line Drain and Sukh Nehr Drain Mughalpura Lahore (Punjab) 80.00 6 1992
10 Extension of ICI Soda Ash Factory (Bela Area and Booster Pump Station) Khewra 100.00 6 1991
11 Bhangali Oil Field Chakwal. (Punjab) 50.00 3 1990
12 Bela Water Supply Line from River Jhelum to ICI soda Ash Factory Khewra. 20.00 3 1990
13 Completion of Leftover work (N-55) Section Bannu – D.I.Khan (80-Km) NWFP 320.00 6 1989
14 Pishin – Saranan Road, Project (Length 13-Km) Balochistan 30.00 3 1990
15 Western Bypass Quetta (Length 23-Km) 100.00 6 1989
16 Indus Highway (N-55) Dadu-Larkana Sub-section Bhan Bridge-Kakkar 200.00 9 1987
17 Kahuti – Berhad Road (Length 33.5-Km) Rawalpindi Punjab 100.00 8 1987
18 Bridge over River Chanab (Upstream) Chiniot Punjab 30.00 6 1987
19 Bridge at Rajoya Abbottabad 20.00 6 1986
20 Survey & Design of Rawalpindi – Murree – Kashmir Road, Mile 5.75 to 25.0 50.00 6 1986
Total 10390.00

 

SERVICES:

A      Reconnaissance Surveys                                                                    E      Location/Staking out Survey

B      Traverse Survey                                                                                     F       Cross Sections

C      Topographic Survey                                                                              G      Canal/Nullah Survey

D      Bench Mark precise Levelling                                                             H      Monumentation Survey

BUILDINGS

Sr.
No.
NAME OF PROJECT FINANCIAL
OUTLAY
(Rs. Million)
COMPLETION
TIME
(Months)
YEAR A B C D E F G H
1 Large Number of Residential Buildings Lahore (100 Nos.) 100.00 120 1998
2 Five Stories Plaza in X-Block, Defence Lahore. 20.00 4 1997
3 Bukhsh Tanneries on Lahore – Kasur Road. 20.00 5 1997
4 Pearl centre, Islamabad 15.00 6 1996
5 New Syed Mill, Sheikhuypura Road, Lahore 10.00 4 1994
6 School/Commercial Plaza Gulshan Ravi, Lahore. 12.00 4 1994
7 6-Storey Commercial Plaza (Gulshan Height) Gulshan Ravi, Lahore. 20.00 8 1994
8 Shopping Centre in Qanchi Amar Saddu, Lahore. 8.00 6 1994
9 Kumho Lighting Project, Lahore Sheikhupura Road 20.00 8 1994
10 Buraq Knit Wear (Pvt) Ltd. Near Lahore. 10.00 6 1993
11 Super Fabrics Raiwind – Managa Road, Near Lahore 10.00 6 1993
12 Architectural Planning and Detailed Design of Jaffaria Complex at Islamabad

–        Central Secretariat

–       Conference Hall & Cultural Centre

–       Central Mosque for 5000 Persons

–       School and Hostel for 100 Girls

–       School and Hostel for 300 Boys

–       Shopping Centre

–       Library and Research Centre

–       Residential Colony

–       (Total Covered Area = 273.600 Sft.)

110.00 24 1993
13 ICI Soda Ash Factory extension of Khewra Distt. Jehlum (Punjab) 5.60 6 1990
14 Bangali Oil Field Dehydration Facility in Chakwal Distt. (Punjab) 50.00 12 1990
15 Buildings and Roads of Lahore Cycle Industries, Ferozepur Road, Lahore (Punjab) 50.00 12 1986
16 New Workshop and Transfer Station, Outfall Road, Lahore sublet from Myco Surveys (Punjab) 15.00 6 1986
HOSPITALS:
17 Al-Zahra Clinic Hospital, (25 Bed) Multan Road, Lahore. 10.00 18 1994
18 Zainbia Trust Hospital, (50 Bed) Near Mansora, Lahore. 16.00 32 1996
TOTAL FINANCIAL OUTLAY: 501.60

 

SERVICES:

A      Architectural development and detailing.                                          F       Sewerage and storm water storage

B      Structural design and detailing                                                           G      BOQ, Cost Estimates and Tender Documents

C      Services design and detailing                                                             H      Supervision of construction

D      Road design and detailing

E         Water distribution design

WATER SUPPLY & SEWERAGE

 

Sr.

No.

NAME OF PROJECT FINANCIAL

OUTLAY

(Rs. Million)

COMPLETION

TIME

(Months)

YEAR A B C D E F G H
1 Water Supply, Sewerage and Drainage of Sargodha Housing Colony, Raiwind Road, Lahore (1000 Kanals) 150.00 12 1996
2 Water Supply, Sewerage and drainage of Wapda Housing Society in association with Abbas Associates (4000 Kanals) 400.00 12 1994
3 Water Supply, Sewerage and drainage of Model town Housing Society, Sargodha in Association with Abbas Associate (2000 Kanals) 200.00 12 1994
4 Rehabilitation and Improvement of Roads, Sewerage and Water Supply in areas of NA-97/PP-126 (Kot Lakhpat, Amar Saddu, Green Town) From Prime Minister’s Funds. 100.00 12 1993
5 Sukh Nehr Drain, Lahore 50.00 6 1992
6 Baja Line Drain, Lahore 30.00 6 1992
TOTAL FINANCIAL OUTLAY: 930.00  

 

SERVICES:

A      Topo Survey                                                                                           E      Preliminary Design

B      Geotechnical Investigations                                                                F       Final Design/Cost Estimates

C      Hydrological                                                                                            G      Tender Documents

D         Feasibility/Economic Studies        H         Construction Supervision

POWER DISTRIBUTION

 

Sr.

No.

NAME OF PROJECT FINANCIAL

OUTLAY

(Rs. Million)

COMPLETION

TIME

(Months)

YEAR A B C D E F G H I J
1

 

 

 

 

 

 

 

Rural electrification Project, Balochistan and 4 District of sind Group “G” in association with M/s Pakistan Consultants International Total No. of Villages = 905

 

PCC share = 475 Villages in 4 Districts of Larkana Dadu, Shikarpur and Jacobabad (Sind)

 

 

 

230.00 42 1993-97
TOTAL FINANCIAL OUTLAY 230.00  

 

SERVICES:

A      Collection of information                                                                      F       Preparation of tender Documents

B      Topographic survey of the village and 11KV line.                           G      Evaluation of Tenders and Award to Contractor

C      Transmission and Processing of information.                                  H      Supervision of Contractors Work

D      Planning, Load Forecasts, System/Detailed Design                       I        Acceptance of completed Works

E      Preparation of work Order                                                                    J       Preparation of Completion Report

IRRIGATION & DRAINAGE

 

Sr.

No.

NAME OF PROJECT FINANCIAL

OUTLAY

(Rs. Million)

COMPLETION

TIME

(Months)

A B C D E F G H I J
1

 

 

Condition Suervey of 1500 Km Drains in Lahore, Faisalabad and Sargodha.

 

3000.00 42
TOTAL FINANCIAL OUTLAY 3000.00  

 

SERVICES:

A      Survey                                                                                                     F       Preliminary Design

B      Geotechnical Investigation.                                                                 G      final Design / Cost Estimates.

C      Hydrological Investigation                                                                    H      Tender documents

D      Traffic Studies                                                                                        I        Construction Supervision

E      Feasibility / Economic Studies                                                            J       Orthers.